1. Excavation
- Backfill cover (A) may range from 6" to 30".
- Sidewall and end wall allowance (B) should be 18'' to 24".
- Bedding (C) should be a well compacted sand/gravel mixture: 6'' minimum in soil terrain, 12" minimum in rock terrain.
|
|
2. Lid and Manhole Extension
- For proper fit, install the lid and/or manhole extension before you put water in the tank and backfill.
- Please note the direction of flow - the inlet is higher than the outlet.
|
|
3. Installation of Bulkhead Fittings
- Install bulkhead fitting in either side of manway or end rib as shown.
- Tank must be vented.
- Tank lid includes gasket and stainless steel screws for water-tight seal.
|
|
4. Backfilling Exterior and Filling with water
- CAUTION: Start filling the tank with water when you begin to backfill, keeping the water level even with the backfill level-as you go.
- Backfill in 12" maximum layers with a well compacted sand/gravel mixture. ALWAYS COMPACT ENDS FIRST.
- Tamp and compact backfill under inlet and outlet pipe.
|
|
5. Backfilling the Top of Tank
- Once the tank is filled with water, backfill to the surrounding level to a maximum of 30".
|
|
General Notes:
- Do not install tank in water-saturated clay or in high water table.
- Do not install tank across the path of vehicles or heavy equipment.
- The tanks are designed for below ground use only.
- For a water-tight seal, lid must be sealed with silicone caulking.
- Cistern tanks should remain one-fourth full at all times.
Failure to comply with our installation procedures and general notes will void the warranty.
|